MOLLER Final Design Review 2022
- MOLLER Final Design Review 2022https://jeffersonlab.sharepoint.com/sites/MOLLER/SitePages/MOLLER-%20Final%20Design%20Review%20SubSystems%2012.2022.aspxF113, F224/225, F226, F228, L102 / Hybrid2022-12-05EST8:30:00 ~ 2022-12-08EST17:00:0018047
To Analyze the readiness for MOLLER Project team at the 90% readiness point. Ensure the designs meet the experiment, technical, and interface requirements. Subsystems follow JLab standards of ESH&Q. Confirm that recommendations stemming from the Preliminary Design Review are sufficiently addressed.
Event Date
-
Location
F113, F224/225, F226, F228, L102 / Hybrid
Category
Scientific Program
Reviews
Contact Name
Robin Wines
Phone
(757) 269-7175
Email