JEFFERSON LAB SEARCH
*Use spaces between key words, no punctuation needed *Sign In for authenticated content
-
-
-
-
A recording of the Theory Seminar given by Kyle Lee on Jan 22nd, 2024.
A talk by Kyle Lee.
-
Project Progress Summary
24 July 1990
Injector
-Cryounit A’ was cooled down after repair of the beamline vacuum accident. Both cavities reached 5 MV/m gradient, although at reduced Qo (~5 x 10^8), permitting full-energy injector tests to resume.
-Preparations for fully computer-controlled operation of the capture accelerator RF system are nearly complete, and everything appears satisfactory.