JEFFERSON LAB SEARCH
-
Jefferson Lab Weekly Briefs
June 15, 201612 GeV Upgrade
In Hall C, the cryo-control reservoir for the Super High Momentum Spectrometer dipole magnet and related hardware was received on-site from the magnet vendor, Sigmaphi, in France. Visual inspection upon receipt was good, and acceptance testing is underway. Hall B is continuing pump-down of the Torus vacuum jacket in preparation for cool-down. The Physics Division will convene an Experimental Readiness Review for the Torus cool-down on June 14.Physics
-
-
Jefferson Lab Weekly Briefs
June 2, 201612 GeV Upgrade
The Hall B CLAS12 Torus magnet vacuum jacket is being pumped down in preparation for cooling and power tests. As expected during magnet commissioning, minor leaks are being found and repairs completed. Last week, Hall C saw its first beam in many years. The low energy, pulsed beam was used to check out the new beamline into Hall C, which will help the future beam commissioning of the Super High Momentum Spectrometer by identifying any issues well in advance.Physics
-
-
Jefferson Lab Weekly Briefs
November 18, 2009 -
-
-
Jefferson Lab Weekly Briefs
December 16, 2009 -
Jefferson Lab Weekly Briefs
January 6, 2010All-JLab Memos
Radioactive Material Disposal
RadCon is implementing a new policy during the Winter Scheduled Accelerator Down. RadCon waste cans for disposal of radioactive material will be placed in beam enclosure areas and buildings where work with radioactive material occurs. The containers will be placed in the following locations: North Linac; South Linac; BSY; FEL; Halls A, B, C; Physics Storage Building; EEL and Test Lab. -