Table of ContentsAfter reviewing this finding aid, if you find inaccuracies and/or outdated information, please email history@jlab.org with suggestions for corrections. |
|
Repository: | Thomas Jefferson National Accelerator Facility |
Jefferson Lab Archives | |
12000 Jefferson Ave., Room L203A | |
Newport News, VA 23606 | |
Phone: (757) 269-7805 | |
Fax: (757) 269-5427 | |
Email: history@jlab.org | |
https://www.jlab.org/info_resources/archives | |
Provenance: | Thomas Jefferson National Accelerator Facility |
Title: | Institutional Records: Experimental Halls - Hall C |
Dates: | 1994-2012 |
Size: | Nine telescoping Hollinger boxes, 2 document Hollinger boxes, 1 clamshell box; 9.77 linear feet |
Materials in collection: | Experimental logbooks, photographs |
Abstract: | The research equipment in Hall C is used to study the weak charge of the proton, form factors of simple quark systems, the transition from hadrons to quarks and nuclei with a strange quark embedded.
An international collaboration of scientists participate in experiments carried out in Hall C. Hall collaborators represent more than 70 institutions and 20 countries. |
Identification number: | JL.014-3 |
Location: | Jefferson Lab Archives |
Language: | English |
Scope and Content
Prior to digital record keeping and electronic logbooks, notes and information on experiments within Experimental Halls were manually written in logbooks.
The dates and notes listed for each book is what is listed in what was recognized as a make-shift table of contents in the logbook. There were a few logbooks that lacked this information.
(More information regarding Experimental Hall C and its mission is pending)
Collection Information
There are four series within this collection; they were retained together as the collection was accessioned:
Series I: Logbooks. This is series makes up the more than 26 logbooks that Hall C used during their experimental runs prior to the change to digital record keeping.
Series II: Experimental Information. Information on individual experiments is located within this series.
Series III: Experimental Software. This series is testing of experimental software and results.
Series IV: Target Shift. Check list information from Target Shift.
Restrictions
Access Restrictions
- The digital collection may be used solely for noncommercial educational and research purposes. Please contact history@jlab.org if you would like to use the collection.
Use Restrictions
- Jefferson Lab is providing access to the materials in the Archive's collections solely for noncommercial educational and research purposes. The unauthorized use, including, but not limited to, publication of the materials without the prior written permission of Jefferson Lab is strictly prohibited. All inquiries regarding permission to publish should be submitted in writing to the Archivist. In addition to permission from Jefferson Lab, permission of the copyright owner
(if not Jefferson Lab) and/or any holder of other rights (such as publicity and/or privacy rights) may also be required for reproduction, publication, distribution, and other uses. Responsibility for making an independent legal assessment of any item and securing any necessary permissions rests with the persons desiring to publish the item. Jefferson Lab makes no warranties as to the accuracy of the materials or their fitness for a particular purpose.
Administration Information
Preferred Citation:
[Identification of Item], Box [insert number], Item or Folder [insert number and title], Institutional Records: Experimental Halls - Hall C. Jefferson Lab
Archives, Thomas Jefferson National Accelerator Facility, 12000 Jefferson Ave., Room L203A, Newport News, VA, 23606
Acquisition Information:
This collection was acquired from the Jefferson Lab Library.
Processing History:
This collection was processed by Melissa Erlandson in November, 2017.
Acknowledgement:
This collection was supported in part by a grant from the History Programs, American Institute of Physics.
Series I: Log Books
Box 1
- Book 1: 18 June 1994 - 27 July 1994
No contents listed - Book 2: 11 August 1994 - 26 December 1994
Scintillator mean target
Beam I monitor
Scint. Near arc - Book 3: 23 February 1995 - 15 November 1995
Using X terminals to connect to HVPS's, VMF, FBUS, etc.
SOS magnet controls
SOS B/I curves
HMS LM2 relay problem
First BCW Calib (I-Pass)
Change HMS polarity for protons
Joe Bean Mitchell sees first coincidence, requests commemorative pen
Second BCM calib (2-pass) - disk full no data
Meekins analysis of -1, 0, +170 quad scan
Quad scan -570 to +570
Set up 70/0 MHz RF into TDC stop
Chem's arc test
Cryo ____ (illegible) lifting mechanism
HSM carriage remote controls
Slit controls
Superharp positions
Box 2
- Book 4: 15 November 1995 - 7 December 1995
Cryotarget lifting mechanism
HMS carriage remote control (old)
Slits controls
Superharp positrons
Coincidence timing (electronics)
Gas bottle changing procedures
Kludge2 solid target positrons
HMS/SOS Remote control
BPM calibrations (old)
Target thickness
HMS dipole setting procedure
BLM positrons
Raster settings - Book 5: 7 December 1995 - 2 March 1996
Resetting HMS Quad Failures
BCM Calibration Procedure
Aerogel HV
SOS Hoposcope HV info
Epics HV controls
Spectrometer rotation
SOS magnet setting
HMS DeGauss Procedure
Background detectors - Book 6: 4 March 1996 - 1 April 1996
BCM calibration
Box 3
- Book 7: 1 April 1996 - 10 May 1996
Magnet reset help (dump switch interlock)
Spectrometer rotation
Dave Meekin's scaler monitoring code
Target survey - Book 8: 10 May 1996 - 29 July 1996
Resetting HMS dipole
DC gas flow information
Solid target rotation
Clearing "MPS Overtemp" error
Lates PBLM HV settings - Book 9: 29 July 1996 - 24 August 1996
El datic reset
Box 4
- Book 10: 22 August 1996 - 24 September 1996
Rotation
SOS door opening procedure
Slated tgt encoder positions - Book 11: 25 September 1996 - 15 October 1996
SOS door opening procedure
Quick Unser beam current measurement
Rotation outward from the minimum angle
Threshold (pedestal) file - Book 12: 16 October 1996 - 11 November 1996
(no contents listed)
Box 5
- Book 13: 13 November 1996 - 19 December 1996
Phone list
Shift schedule
BC calib.
11/15/96
11/17/96
11/22/96
11/24/96 - Book 14: 19 December 1996 - 9 April 1997
All about HCAL
Final rev set in logbook #15, p. 106
HV correction from cosmic
About scalers for _____ (illegible), see logbook 15, p. 104
List of experts
HMS magnet overtemp reset
Timing calculations for deuteron TOF at the t20 kinematic points
Polder timing (electronic)
BCM calib. - Book 15: 9 April 1997 - 24 April 1997
(no contents listed)
Tab 1 - 1.6 GeV production
Tab 2 - A (Q2)
Tab 3 - 2.4 GeV pt. #4
Tab 4 - timing 2.4 GeV
Box 6
- Book 16: 15 April 1997 - 14 May 1997
A(Q2) run sheets E=1.411 GeV
ENT/Meekins run sheets E=1.411 GeV
Refraction field - V for HMS dipole
How to modify channel a HMS PS without EPICS
A(Q2) @ 2.1 GeV
Timing of POLDER
Cryotarget info (length, position, etc.)
Tab 1 - 1.4 GeV pt. 1
Tab 2 - POLDER timing
Tab 3 - A(Q)
Tab 4 - 2.1 GeV pt. 3
Tab 5 - original ___ (illegible) setup
Tab 6 - A(Q) - Book 17: 15 May 1997 - 11 June 1997
Continuation of 2.1 Gev
Timing of Polder
Beginning of 2.4 GeV
12C Sieve slit nns
t20 energy dependence
_____ (illegible) ed slopes
1 week access
Roger's 60 Hz noise test
D-channel @ 3.2 GeV
Tab 1 - td1 slopes
Tab 2 - A(q) 2.4
Tab 3 - 3.2 GeV - Book 18: 12 June 1997 - 14 August 1997
A(Q2) Kinematic 5, E=3 2 GeV
Tab 1 - A(q)
Tab 2 - A(q)
Box 7
- Book 19: 17 July 1997 - 6 August 1997
(no contents listed) - Book 20: 15 August 1997 - 1 September 1997
Tab 1 - 4.0
Tab 2 - A9q)
Tab 3 - π0 (4.0)
Tab 4 - 1.6
Tab 5 - 12C (___ (illegible) scan)
Tab 6 - 12C (utar) - Book 21: 31 August 1997 - 5 November 1997
Tutorial on HMS quad reset from downstairs
Tab 1 - HMS optic @ 0.8 GeV
Tab 2 - target luminosity test
Tab 3 - end of t20
Box 8
- Book TGT3: 25 July 1996 - 7 April 1997
Log HCC24: UA list all
Dr # program [shig] AC2 DE2 VE5
Dummy target survey and thickness
Cryo rotator system parameters and wire connectors
Reboot Jeffy Lab
Aux heater settings
ITC502 PID settings
When ESR signals die
Solid target ladder - Book Target Log: 29 April 1997 - 5 March 1998
Flow test
Filling targets
ITC PID parameters
Info on boof directories for alarm handlers - Book G n/e: 12 June 1998 - 19 September 1998
The use of HC log is strongly recommended
Box 9
- Book Unt.: 5 March 1998 - 29 October 2000
PID settings
IOC login
D2 fan currents vs. frequency - Book SOS: 12 January 1999 - 12 February 1999
(no contents listed)
Box 10
- Book 1: 8 March 1996 - 25 July 1996
Hall C Cryotarget #2 - Book 2: 5 December 1997 - 12 December 1997
JLab E91-03 cryocompressor - Book 3: 17 December 1997 - 2 August 1999
CEBAF VIII - Book 4: 1 November 2000 - 23 April 2001
Hall C Target Logbook - Book 5: 22 June 2010 - 20 January 2012
Hall A & C Compton Log - Book 6: undated
Hall C Floor Plan Racks/Cables
Series II: Experimental Information
Box 11
- Folder 1: E89-008 Info
- Folder 2: E08-016
- Folder 3: Beamline File
Series III: Experimental Software
- Folder 4: Snapshot from 08/97
- Folder 5: Forms
- Folder 6: energy_msr
- Folder 7: Target
- Folder 8: bpm
- Folder 9: Diagrams
- Folder 10: Trigger
- Folder 11: tof_software
- Folder 12: slow_controls
- Folder 13: Detectors
Box 12
- Folder 1: data_acquisition
- Folder 2: bcm
- Folder 3: analysis_code
- Folder 4: SOS_handbook
- Folder 5: Plots
- Folder 6: Raster
Series IV: Target Shift
- Folder 7: Target Shift Checklist 1999 - 10/20/1999, 1 of 2
- Folder 8: Target Shift Checklist 1999 - 10/20/1999, 2 of 2
- Folder 9: Sane Target Shift Info, 02/2009