JEFFERSON LAB SEARCH

(Show results from this date)
(Show results to this date)
*Use spaces between key words, no punctuation needed *Sign In for authenticated content

  • EIC Center at Jefferson Lab

    The Electron-Ion Collider Center at Jefferson Lab (EIC2@JLab) is an organization to advance and promote the science program at a future electron-ion collider (EIC) facility. Particular emphasis is on the close connection of EIC science to the current Jefferson Lab 12 GeV CEBAF science program.   

     

    EIC2@JLab consolidates and connects the EIC physics and detector development activities in and around Jefferson Lab. These activities include:

    • Activities of the Jefferson Lab EIC groups
    • JLab EIC weekly general meetings.
    • Organizing and hosting of EIC related ad-hoc workshops.
    • Documentation of EIC and JLEIC relevant topics.

     

    Further, EIC2 coordinates with the following activities:

    • Relevant Jefferson Lab LDRD projects.
    • Relevant EIC Detector R&D funded activities.
    • HUGS Summer School.
    • Local hosting of relevant national and international conferences.
    • Planning of the EIC component in the annual JLab Users Group meeting.

     

    In addition, EIC2 establishes the following new activities:

    • Graduate and post-doc Fellowship program.
    • Series of seminar talks related to EIC.

     

     

    EIC2@JLab Management

    EIC2@JLab Advisory Board

     

    The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is located at 12000 Jefferson Avenue in Newport News, Virginia.

  • PDF Download

    Project Progress Summary

    5 September 1990

    Injector and Front-End Test

    -Waveguide connections to the first HPA have been done and klystrons are being installed.

    -Plumbing for injector service building has been installed. LCW system operational.

    -The approach has been defined for cryomodule installation sequence. First cryomodule slated to be installed by 7 September.

  • PDF Download

    Project Progress Summary

    11 September 1990

    Injector and Front-End Test

    -First cryomodule is in the tunnel.

    -Four klystrons have been installed in the first HPA.

    -Copper cavities (chopper 1 & 2, capture section) have been installed on the injector girder as injector reassembly continues.

    -Electronics have been reinstalled in high-voltage cage for the gun. First try to run gun from control room this week.

  • PDF Download

    Project Progress Summary

    18 September 1990

    Injector and Front-End Test

    -Injector main pump and vacuum manifold installed.

    -Fabrication of 5-MeV chicane vacuum chambers started on schedule at University of Illinois.

    -Cables for injector magnets and controls pulled.

    -First cryomodule has been mounted on its stands and cabling is proceeding.

  • PDF Download

    Project Progress Summary

    16 October 1990

    Injector and Front-End Test

  • PDF Download

    Project Progress Summary

    23 October 1990

    Semi-Annual Review

    Project preparations for a November review are continuing, although the date has not been set yet.

    Injector and Front-End Test

    -Beam viewers in the injector became operational in preparation for a 100-kV beamline test planned for this week.

  • PDF Download

    Project Progress Summary

    30 October 1990

    Injector and Front End Tet

  • Jefferson Lab Weekly Briefs
    April 10, 2013

    Physics

    Registration Open for Annual Users Group Meeting
    The 2013 JLab User's Group Annual Meeting will take place on May 29-31. The program includes a variety of physics talks, presentations from the Users Group Board, laboratory management and funding agencies, and talks from the new APS fellows and prize winners. Register now online.