JEFFERSON LAB SEARCH

(Show results from this date)
(Show results to this date)
*Use spaces between key words, no punctuation needed *Sign In for authenticated content

  • High School Student Intern Program

    The Student Aide Program is a work/study program for high school students. It is separate from the existing Student Internship program, which is geared to undergraduate and graduate students, and the Summer Honors Internship Program (SHIP).

    Candidates for the program must have completed the sophomore year of high school, be at least 16 years of age, and be recommended by their school.

    Students must maintain at least a 2.5 GPA each semester.

    Students need to submit an up-to-date transcript at the end of each semester.

  • RETIREMENT: Teachers Insurance & Annuity Association/College Retirement Equities Fund (TIAA/CREF). JSA/JLab provides a 401(k) defined contribution plan that provides benefits through annuities. JSA/JLab will make a 9% base salary compensation contribution in lieu of a matching feature on the plan. The 9% contribution will be made by the Lab even if employees waive participation.

  • Streamlining sustainability choices to minimize negative environmental impacts

  • PDF Download

    Project Progress Summary

    5 September 1990

    Injector and Front-End Test

    -Waveguide connections to the first HPA have been done and klystrons are being installed.

    -Plumbing for injector service building has been installed. LCW system operational.

    -The approach has been defined for cryomodule installation sequence. First cryomodule slated to be installed by 7 September.

  • PDF Download

    Project Progress Summary

    11 September 1990

    Injector and Front-End Test

    -First cryomodule is in the tunnel.

    -Four klystrons have been installed in the first HPA.

    -Copper cavities (chopper 1 & 2, capture section) have been installed on the injector girder as injector reassembly continues.

    -Electronics have been reinstalled in high-voltage cage for the gun. First try to run gun from control room this week.

  • PDF Download

    Project Progress Summary

    18 September 1990

    Injector and Front-End Test

    -Injector main pump and vacuum manifold installed.

    -Fabrication of 5-MeV chicane vacuum chambers started on schedule at University of Illinois.

    -Cables for injector magnets and controls pulled.

    -First cryomodule has been mounted on its stands and cabling is proceeding.

  • PDF Download

    Project Progress Summary

    16 October 1990

    Injector and Front-End Test

  • PDF Download

    Project Progress Summary

    23 October 1990

    Semi-Annual Review

    Project preparations for a November review are continuing, although the date has not been set yet.

    Injector and Front-End Test

    -Beam viewers in the injector became operational in preparation for a 100-kV beamline test planned for this week.

  • PDF Download

    Project Progress Summary

    30 October 1990

    Injector and Front End Tet