• Mechanical engineering model

Mechanical Systems

The Mechanical Systems Department provide a variety of design, engineering, technical, and fabrication services that support the Thomas Jefferson National Accelerator Facility (TJNAF), a world leading nuclear physics research facility, sponsored by the U.S. Department of Energy.  The Mechanical Systems Department is comprised of the Alignment & Metrology Group, Installation/Vacuum Group, the lab Machine Shop, Mechanical Engineering Group (with mechanical design services), and Document Control.  These groups are utilized lab wide and service CEBAF, the Experimental Halls, and the SRF Institute, as well as Work for Others in support of other DOE National Labs.

Work Schedule

  • Monday - Friday: 8:00 a.m. - 5:00 p.m.
 

Mechanical Systems Leader

ALIGNMENT & METROLOGY GROUP (MSSURV)

Work Schedule

  • Monday - Friday: 7:00 a.m. - 4:00 p.m.
  • Alternate Work Schedule:
    • Christopher Curtis, 4 x 9 hrs., 4 hr. Friday
    • Christopher Gould, 4 x 9 hrs., 8 hr., Friday off
 

Alignment & Metrology Leader

 

INSTALLATION and VACUUM GROUP (MSINST)

Daily Work Schedule:

  • Vacuum Group:  Monday - Friday:
    8:00 a.m. - 5:00 p.m.
  • Installation Group:  Monday - Friday:
    6:00 a.m. - 3:00 p.m.
 

Installation and Vacuum Group Team:

MACHINE SHOP (MACHSP)

Work Schedule:

  • Monday - Friday: 6:30 a.m. - 3:00 p.m.
 

Machine Shop Team:

 

MECHANICAL ENGINEERING GROUP (MSMECH)

Work Schedule:

  • Monday - Friday: 8:00 a.m. - 5:00 p.m.
  • Alternate Work Schedules:
    • Gary Hays, 4 x 9 hrs., 4 hr., Friday
    • Chuck Hutton, 8 x 9 hrs., 8 hr., Friday off
    • Ronald Lassiter, 4 x 10 hrs., Friday off
    • Damon Rath, 8 x 9 hrs., 8 hr,, Friday off
 

Mechanical Engineering Team:

Work Schedule

  • Monday - Friday: 8:00 a.m. - 5:00 p.m.
 

Mechanical Systems Leader

ALIGNMENT & METROLOGY GROUP (MSSURV)

Work Schedule

  • Monday - Friday: 7:00 a.m. - 4:00 p.m.
  • Alternate Work Schedule:
    • Christopher Curtis, 4 x 9 hrs., 4 hr. Friday
    • Christopher Gould, 4 x 9 hrs., 8 hr., Friday off
 

Alignment & Metrology Leader

 

INSTALLATION and VACUUM GROUP (MSINST)

Daily Work Schedule:

  • Vacuum Group:  Monday - Friday:
    8:00 a.m. - 5:00 p.m.
  • Installation Group:  Monday - Friday:
    6:00 a.m. - 3:00 p.m.
 

Installation and Vacuum Group Team:

MACHINE SHOP (MACHSP)

Work Schedule:

  • Monday - Friday: 6:30 a.m. - 3:00 p.m.
 

Machine Shop Team:

 

MECHANICAL ENGINEERING GROUP (MSMECH)

Work Schedule:

  • Monday - Friday: 8:00 a.m. - 5:00 p.m.
  • Alternate Work Schedules:
    • Gary Hays, 4 x 9 hrs., 4 hr., Friday
    • Chuck Hutton, 8 x 9 hrs., 8 hr., Friday off
    • Ronald Lassiter, 4 x 10 hrs., Friday off
    • Damon Rath, 8 x 9 hrs., 8 hr,, Friday off
 

Mechanical Engineering Team: