JEFFERSON LAB SEARCH

(Show results from this date)
(Show results to this date)
*Use spaces between key words, no punctuation needed *Sign In for authenticated content

  • Name Period  Position Email Institution
    Rabah Khalek 2021-2022 postdoc (ECA)    
    Paweł Ambrozewicz
  • Jianwei Qiu
    Associate Director for Theoretical and Computational Physics, and Theory Center Director
    (757) 269-6026, Rm A208
    jqiu@jlab.org

    Suite 1
    12000 Jefferson Avenue
    Newport News, VA 23606
    (757) 269-6263
    Fax (757) 269-7002

  • Parton distribution functions describe collinear momentum distribution of quarks, antiquarks, and gluons (partons) in hadrons.

    Different QCFs

    Different Observables

    • Deep Inelastic Scattering
    • Drell-Yan
  • Monday, January 23rd, 9:00 AM
    M. Padmanath (Institute of Mathematical Sciences - Chennai)
    S-wave scattering of triply bottom baryons from lattice QCD [slides][video]

  • Thomas Jefferson High School for Science and Technology wins 23rd Virginia Regional High School Science Bowl competition

    NEWPORT NEWS, VA – Thomas Jefferson High School for Science and Technology continued their winning streak at the 23rd Virginia Regional High School Science Bowl competition on Feb. 3. The U.S. Department of Energy's Thomas Jefferson National Accelerator Facility hosted the in-person event for the first time since 2020.

  • PDF Download

    Project Progress Summary

    5 September 1990

    Injector and Front-End Test

    -Waveguide connections to the first HPA have been done and klystrons are being installed.

    -Plumbing for injector service building has been installed. LCW system operational.

    -The approach has been defined for cryomodule installation sequence. First cryomodule slated to be installed by 7 September.

  • PDF Download

    Project Progress Summary

    11 September 1990

    Injector and Front-End Test

    -First cryomodule is in the tunnel.

    -Four klystrons have been installed in the first HPA.

    -Copper cavities (chopper 1 & 2, capture section) have been installed on the injector girder as injector reassembly continues.

    -Electronics have been reinstalled in high-voltage cage for the gun. First try to run gun from control room this week.

  • PDF Download

    Project Progress Summary

    18 September 1990

    Injector and Front-End Test

    -Injector main pump and vacuum manifold installed.

    -Fabrication of 5-MeV chicane vacuum chambers started on schedule at University of Illinois.

    -Cables for injector magnets and controls pulled.

    -First cryomodule has been mounted on its stands and cabling is proceeding.